Hong KongChinamalaysiaEcuadorUAE,Abu Dhabi,Dubai,SharjahSingaporeVietnamIndiaPhilippinesKathmandu,NepalDoha,QatarWELLINGTON,auckland,New Zealand San Jose,Costa Rica
Our

armour joints system for concrete floor

protect construction joints from damage.
Our armour joints ( leave-in-place formwork) offer four important benefits:
They act as a permanent formwork, creating a secure boundary or day joint during the concrete pour.
They allow the concrete slab to contract in a controlled way, to prevent random cracks occurring.
They protect the construction joint arrises from impact damage once the building is in use, saving the expense of repair.
They allow efficient load transfer between concrete slabs, for a stable and durable floor.